From takeoff to estimate.

No spam. Unsubscribe anytime.

Subscribe for product updates, tips, and smarter ways to streamline your takeoffs.

Addendum mid-bid: seven steps, log it, acknowledge, find every change, re-check the scale, update only what moved, ask early, say what you priced

Addendum Mid-Bid? What to Do When Drawings Change Before Bid Day

What to do, in order, when an addendum or revised drawings land before bid day,…

Read post

The same flooring scope shown as Detailed, Scope Price and Lump Sum, each totalling $6,349.80

What to Put in a Construction Proposal (and How Much Price to Show)

The checklist for a construction proposal, and when to show line items, a scope price…

Read post

Check the scale before you measure: the demo VCT floor at the right scale 1,189.01 sq ft, 2% off 1,237.05 sq ft, half size set 297.25 sq ft

How to Check the Scale on a PDF Plan Before You Measure

A PDF can lose its scale. Check it against a printed dimension before you measure.

Read post

Markup vs margin on one TakeCost estimate line: cost $4,760.00, 15% markup adds $714.00, price $5,474.00, margin 13.0%

Markup vs Margin for Contractors: Why 15% Markup Isn’t 15% Profit

Markup is on cost, margin is on price. See the difference on a real estimate.

Read post

Waste factor on one tiled room in TakeCost: 137.26 sq ft measured, plus 10% waste is 150.99 sq ft, 9.44 boxes of 16 sq ft rounded up to 10, priced at $928.00

Waste Factor in Construction Estimating: How Much to Add and Where

Add the right waste in the right place, then find your own waste rate.

Read post

Two boxes: getting the quote out with a takeoff and estimating tool (VCT 1,189.01 sq ft, priced at $4.00 plus 15%, $5,474.00 on the proposal) and running the whole job with a wider management system (scheduling, site records, purchasing, job costing, accounting)

Do You Need a Full Construction Management System Just to Improve Your Estimating?

Name the problem you need fixed first, then decide how much software you really need.

Read post

One quoted VCT line followed back: $5,474.00 on the proposal, $4.00 plus 15% in the estimate, 1,189.01 sq ft measured, sheet A1 of the drawing

Why Your Quote Should Be Traceable Back to the Drawing

Follow one quoted line back to the drawing, and catch questions before you send.

Read post

The same 1,189.01 sq ft of VCT priced with two sets of example inputs in TakeCost: $7,019.71 with $4.00 tile and a $65 an hour crew, $6,313.78 with $3.60 tile and a $70 an hour crew

Will Estimating Software Work With Your Own Material Prices and Labour Rates?

Use your own supplier prices and crew rates, and check what the software does.

Read post

One drawing change kept as three separate numbers: scope price up $225.40 from the TakeCost app, 80 minutes of estimating rework and a 2 day wait, both examples

How Much Do Drawing Changes Cost You Before the Job Even Starts?

Follow one finish change from plan to proposal, and keep the two costs apart.

Read post