What to Put in a Construction Proposal (and How Much Price to Show)

The checklist for a construction proposal, and when to show line items, a scope price…

The same flooring scope shown as Detailed, Scope Price and Lump Sum, each totalling $6,349.80

Copy link

A construction proposal should say who it’s for and which drawings it’s based on, the scope you’ll do, the price, what’s included, excluded and allowed for, how long the price holds, when you can start, how you’ll be paid and how the client accepts it.

Then decide how much of the price to break down. Show line items when a GC wants to check your scope line by line, a price per scope for most trade bids, and one lump sum when the job is small and fully drawn. This guide gives you the checklist, the same flooring scope shown all three ways, and the part that prevents most arguments: inclusions, exclusions and allowances.

What to include in a construction proposal: the checklist

A proposal is the price plus everything the client needs to understand it. If you want the difference between a bid, a quote and a proposal first, see takeoff vs estimate vs bid. Here is what goes on the page:

What a construction proposal should include
What to put in itWhy it matters
Client and projectWho it’s for, the project name and address, the dateNobody mixes it up with another job
Drawings it’s based onThe drawing set name and date, or the revision you pricedIf the drawings change, you can show the price was for the old set
Scope of workThe work you’ll do, by area or trade, in plain wordsThe client sees what they’re buying
PriceThe total, and as much breakdown as you choose to showThe number they compare and approve
InclusionsWhat the price covers: supply, install, prep, cleanupStops “I thought that was included”
ExclusionsWhat the price doesn’t cover, even if it’s on the drawingsThe cheapest way to avoid a dispute
AllowancesAmounts for work you can’t measure yet, and what happens if more is neededKeeps an unknown from becoming your loss
Price valid untilA dateMaterial prices move; an old price shouldn’t bind you
ScheduleA start window or how long the work takesThe client can plan around you
Payment termsDeposit, progress payments and when they’re dueYou get paid as agreed
AcceptanceHow the client says yes: a signature, a PO or a written replyThere’s no doubt the price was accepted

Warranty, insurance and licence details belong on it too if your clients or your area expect them. Contract wording is a question for your own adviser, not a blog post.

Line items, scope price or lump sum: how much price to show

The same scope can go out in three ways. Here it is from the TakeCost demo project: porcelain tile in the washrooms and VCT in the showroom, entry and lunchroom, with example unit prices.

The same flooring scope shown three ways
What the client seesWhen it fits
DetailedPorcelain tile 12×24, 151 units at $5.80 = $875.80. VCT tile, 1,190 units at $4.60 = $5,474.00. Total $6,349.80.A GC levelling bids line by line, a client who asked for unit prices, or work that may be added or cut by area
Scope PriceThe two line names, with one scope total of $6,349.80Most trade bids: the client sees what’s in the scope, without a unit price to argue over
Lump SumThe scope name and “Included scope for this proposal section.”, with a total of $6,349.80Small, simple jobs where the drawings are complete

There’s no right answer for every job. More detail builds trust and makes changes easier to price, but it also invites line by line haggling. One number is simple to approve, but it hides what you assumed, so your inclusions and exclusions have to do more of the work.

Whichever you choose, keep the full breakdown on your side. Your cost and markup stay in your estimate. The proposal shows selling prices only.

Inclusions, exclusions and allowances: where most disputes start

Most arguments after a job is won aren’t about the price. They’re about what the price covered. Write these three lists every time, even when the scope looks obvious. Here is what they looked like on the demo floor plan:

  • Inclusions. The room schedule says the washroom tile is supplied by the owner. Say whether you’re pricing supply and install or install only. Both are fair; leaving it unsaid isn’t.
  • Exclusions. The plan also shows polished concrete and carpet. We measured them but didn’t price them. If they’re not in your price, write that down. A client won’t read “not listed” as “excluded”.
  • Allowances. Floor prep can’t be measured until the old floor is up. Price it as its own line with an amount, say what it covers, and say what happens if more is needed.

Exclude by name, not by silence. “Polished concrete and carpet are excluded” is one line, and it can save you a phone call you don’t want.

What to keep off the proposal

  • Your cost and markup. The client sees a selling price. Your cost, markup and margin stay in the estimate.
  • Your working. Waste factors, crew hours and supplier quotes are how you got the price, not part of it.
  • Lines you haven’t priced. Price them, allow for them or exclude them. Don’t leave a measured item sitting on the page with no price.
  • Internal notes. Anything you wrote for yourself or the crew.

Building a construction proposal in TakeCost

In TakeCost, the proposal comes from the priced estimate, so the quantities you measured on the drawings flow straight into it. Most of the checklist has a place in the Proposal tab:

  1. Proposal Details holds the date and an Expiry Date, your price valid until. Prepared For holds the client’s name, address, phone and email.
  2. The Intro is an opening paragraph above the scopes. There’s no separate field for the start window or payment terms, so this is a good place for them.
  3. Each scope is named after the drawing set you measured, and only priced lines appear. Under Display, choose Detailed, Scope Price or Lump Sum. In Detailed, pick the columns: item names, descriptions, quantities, units, unit prices and item totals.
  4. Proposal Notes has two lists, Inclusions and Exclusions, and shows in every display. For an allowance, add a general item in the estimate, a line not tied to a drawing, so it shows as its own priced line.
  5. Turn on Scope Drawings to attach the marked-up drawing pages with a legend of what you measured.
  6. Acceptance adds a signature and date block. Download the PDF, check it and send it.
The TakeCost Proposal tab on the demo project in the Detailed display: porcelain tile $875.80, VCT tile $5,474.00, total $6,349.80
The demo flooring scope in the Detailed display. The VCT markup is built into its $4.60 unit price.
TakeCost Proposal Notes with one inclusion, supply and install of VCT and porcelain tile, and one exclusion, polished concrete and carpet, measured, not priced
Inclusions and exclusions go in Proposal Notes, which shows in every display, so your exclusions go out with the price.

We tested the Proposal tab on a Pro account. Check the pricing page for what each plan includes.

Want the whole path from drawing to proposal? See how contractors build a construction estimate. Then build your next one from the drawings. Get started, it’s free.

About our example

The lines, totals and displays are from the TakeCost demo project in the live app on November 16, 2026. The unit prices are examples, not market prices. We added the two Proposal Notes lines for this guide, checked them in the downloaded PDF and removed them afterwards. The checklist is general guidance, not legal advice.

Frequently asked questions

Is a construction proposal a contract?

It can become part of one once the client accepts it. How that works depends on your contract and where you work, so check with your own adviser.

Should a subcontractor itemize a bid to a GC?

Give the GC what their bid form asks for. If they don’t say, a price per scope with clear inclusions and exclusions is the usual middle ground, and you can share unit prices if asked.

How long should a proposal price be valid?

Long enough for the client to decide, and short enough that your material prices still hold. Write a date on it rather than leaving it open.

What’s the difference between an exclusion and an allowance?

An exclusion is work your price doesn’t cover. An allowance is work your price covers up to a stated amount, because you can’t measure it yet.

Do I show my markup on a proposal?

No. The client sees a selling price. Keep your cost and markup in your estimate.

Measure, price and send your next proposal from one set of drawings. Get started, it’s free.

Reviewed by: Gevoni Thomas, TakeCost

Sources

  • Proposal lines, totals, displays and Proposal Notes: TakeCost demo project in the live app, November 16, 2026.
  • Owner-supplied tile and the unpriced materials: sheet A1 of the demo drawing set.
  • Example unit prices: made for this guide.

Stop Guessing.
Start Winning More Jobs.

14-day free trial No credit card required Cancel anytime

TakeCost FAQ

TakeCost is a cloud-based construction takeoff and estimating platform designed to move you from drawings to a priced bid in one connected workflow. Instead of just measuring quantities, TakeCost allows you to organize, price, and turn those quantities into proposal-ready outputs without switching between tools.

Yes. TakeCost includes a built-in estimating workflow where quantities flow directly into pricing, markups, and totals. This allows you to create proposal-ready outputs without switching tools or rebuilding your estimate.

Yes. TakeCost is designed with a simple and intuitive interface, allowing contractors to start measuring and building estimates quickly without a steep learning curve.

Yes. TakeCost allows teams to share takeoffs with quantities included and collaborate within the same workflow. This makes it easier to manage estimating across multiple users.

Yes. TakeCost is fully cloud-based and works across desktop, tablet, and mobile devices, allowing you to manage takeoffs and estimates whether you’re on-site, in your truck, or in the office.

Yes. AutoScale detects the drawing scale, the Counter tool finds matching symbols and text, and AutoTake measures elevation sheets on the Pro plan. The Congic Assistant answers questions about your drawings, quantities and pricing, and can review your proposal before you send it.