Markup vs Margin for Contractors: Why 15% Markup Isn’t 15% Profit

Markup is on cost, margin is on price. See the difference on a real estimate.

Markup vs margin on one TakeCost estimate line: cost $4,760.00, 15% markup adds $714.00, price $5,474.00, margin 13.0%

Copy link

Markup is what you add on top of your cost. Margin is how much of the selling price is profit. They use the same dollars but divide by different numbers, so a 15% markup is only about a 13% margin. To get the margin you want, divide it by one minus that margin: a 20% margin needs a 25% markup.

This guide works through one real estimate line in TakeCost, gives you a table to go between the two, and shows why the margin on the whole job can be lower than the markup on any line.

Markup and margin on one estimate line

In the TakeCost demo project, the VCT line is 1,190 units at $4 each (an example price), with a 15% markup:

One line, two ways to read the profit
AmountHow it’s worked out
Cost$4,760.001,190 × $4
Profit$714.00$4,760.00 × 15% markup
Selling price$5,474.00$4,760.00 + $714.00
Markup15%Profit ÷ cost: $714 ÷ $4,760
Margin13.0%Profit ÷ price: $714 ÷ $5,474

Same $714 of profit. Measured against the cost it’s 15%. Measured against the price the client pays it’s 13.0%. Margin is always the smaller number, because the price is always bigger than the cost.

The TakeCost Estimate for the demo project: Porcelain Tile 12x24 at 0% markup, $875.80, and VCT tile at $4 a unit with 15% markup, $714.00 profit and a $5,474.00 sell price; the header shows Subtotal $5,635.80, Profit $714.00 and Total $6,349.80
Each line shows its cost, markup, profit and selling price. The header adds them up for the job.

Markup to margin, and back

Use these to check a number quickly. Every figure is rounded to one decimal.

If you mark up by this, your margin is
MarkupMargin
10%9.1%
15%13.0%
20%16.7%
25%20.0%
30%23.1%
50%33.3%
If you want this margin, mark up by
Margin you wantMarkup you need
10%11.1%
15%17.6%
20%25.0%
25%33.3%
30%42.9%

The math behind them:

  • Margin = markup ÷ (1 + markup). A 25% markup: 0.25 ÷ 1.25 = 20%.
  • Markup = margin ÷ (1 − margin). A 20% margin: 0.20 ÷ 0.80 = 25%.

Check the margin on the whole job, not one line

A line can carry a healthy markup while the job doesn’t. In the same demo estimate, the porcelain tile line has no markup at all:

The whole demo estimate
Amount
Cost (Subtotal)$5,635.80
Profit$714.00
Total$6,349.80
Margin on the job11.2%

The VCT line makes 13.0%, but the job makes 11.2%, because one line adds cost and no profit. Look at the job total before you send the price, and ask what each line is marked up on: materials only, or labour and subcontractors too. On a job where labour is most of the cost, a markup on materials alone leaves a thin margin.

In TakeCost each priced line has its own markup, and the Estimate header shows the job’s Subtotal, Profit and Total. To get the job margin, divide Profit by Total. Overhead you want to show on its own can go in as a General item, a line that isn’t tied to the drawing. Saved items in your Cost List have a Markup column too.

Price your next job and see the profit before you send it. Get started, it’s free.

What the client sees

Your client sees prices, not your markup. On the TakeCost proposal for this estimate, the VCT shows as 1,190 units at $4.60, $5,474.00 in total. The 15% is built into the unit price.

That’s also why the words matter. If a client or a general contractor asks for your margin, give them the margin, not your markup. Mixing them up overstates your profit by a couple of points or more.

Common markup and margin mistakes

  • Thinking 15% markup means 15% profit. It’s 13.0% of the price.
  • Setting markup to hit a margin without converting. For a 20% margin you need 25%, not 20%.
  • Lines left at 0%. They add cost and no profit, and pull the job margin down.
  • Markup on materials only. Check what the job margin is once labour and subs are in.
  • Cutting markup to win a bid without checking what’s left. Convert it to margin first.

About our example

The quantities and lines are from the TakeCost demo project in the live app on November 11, 2026, on a Pro account. The $4 and $5.80 unit prices and the 15% markup are examples, not market prices or a suggested markup.

Frequently asked questions

Should I price with markup or margin?

Most estimates are built with markup, because you start from cost. Check the result as a margin, because that’s the share of the price you keep.

What’s a good margin for a contractor?

It depends on your overhead, the size of the job and how much risk you carry. Work out what your overhead costs you each year first; your margin has to cover it before any of it is profit.

How do I turn a margin into a markup?

Divide the margin by one minus the margin. For 20%: 0.20 ÷ 0.80 = 25% markup.

Does TakeCost show my margin?

TakeCost shows the cost, markup, profit and selling price on every line, and Subtotal, Profit and Total for the job. Divide Profit by Total to get the margin.

Build your next estimate with the profit in plain sight. Get started, it’s free.

Reviewed by: Gevoni Thomas, TakeCost

Sources

  • Estimate lines, totals and proposal: TakeCost demo project in the live app, November 11, 2026.
  • Example unit prices and markup: examples made for this guide.

Stop Guessing.
Start Winning More Jobs.

14-day free trial No credit card required Cancel anytime

TakeCost FAQ

TakeCost is a cloud-based construction takeoff and estimating platform designed to move you from drawings to a priced bid in one connected workflow. Instead of just measuring quantities, TakeCost allows you to organize, price, and turn those quantities into proposal-ready outputs without switching between tools.

Yes. TakeCost includes a built-in estimating workflow where quantities flow directly into pricing, markups, and totals. This allows you to create proposal-ready outputs without switching tools or rebuilding your estimate.

Yes. TakeCost is designed with a simple and intuitive interface, allowing contractors to start measuring and building estimates quickly without a steep learning curve.

Yes. TakeCost allows teams to share takeoffs with quantities included and collaborate within the same workflow. This makes it easier to manage estimating across multiple users.

Yes. TakeCost is fully cloud-based and works across desktop, tablet, and mobile devices, allowing you to manage takeoffs and estimates whether you’re on-site, in your truck, or in the office.

Yes. AutoScale detects the drawing scale, the Counter tool finds matching symbols and text, and AutoTake measures elevation sheets on the Pro plan. The Congic Assistant answers questions about your drawings, quantities and pricing, and can review your proposal before you send it.